Categories
Search


Advanced Search
More Features

Newsletter
Sign up for our newsletter:
To learn more Click Here
Site Sponsors
Article Options
Popular Articles
  1. Brampton Board of Trade CEO leaving
  2. Brampton Youth Forum a Success
  3. Brampton City Council Abandons the Fight to Protect Natural Areas
  4. Peel Board Students Tackle Tough Legal Issues at Annual Mock Trial Tournament
  5. Stay the Course Action Lacks Stimulus
No popular articles found.
 »  Home  »  City/Region News  »  Region of Peel Announcements  »  Peel Approves Plan for Energy Recovery Centre
Peel Approves Plan for Energy Recovery Centre
By Region of Peel | Published  07/2/2013 | Region of Peel Announcements | Unrated
Region of Peel
The Region of Peel delivers a wide range of programs and services to more than one million citizens every day. This includes ambulance services, public health, long-term care, child care, waste collection, recycling and disposal, water and wastewater services, Regional road construction and maintenance, social assistance and affordable rental housing. Regional Headquarters are located at 10 Peel Centre Dr., Brampton, ON. Phone Number: 905-791-7800. 

For frequent updates, visit Region of Peel for more information. 

View all articles by Region of Peel
Brampton - Peel Regional Council approved the Region’s plan to design, build, operate and maintain the Peel Energy Recovery Centre.

“The development of the Peel Energy Recovery Centre is a key component of the Region’s Long Term Waste Management Strategy, which aims to recover and effectively use resources from our waste stream so we can conserve natural resources,” remarked Councillor Sanderson, Chair of the Waste Management Committee. “The Peel Energy Recovery Centre is a responsible choice for managing Peel's residual waste.”

“In a survey conducted last fall (2012), residents told us they wanted the Region to work towards reducing waste generation and increasing resource recovery in a way that protects the environment,” explained Norm Lee, Director of Waste Management for the Region of Peel. “The new energy recovery centre will enable us to safely and reliably recover valuable resources, such as energy and recyclable metals, which would otherwise be lost in a landfill.” The same survey showed that the majority of Peel’s residents supported the development of an energy-from-waste facility within Peel, over hauling Peel’s waste to an out-of-Region landfill.

Using an established energy-from-waste technology, the Peel Energy Recovery Centre will process 300,000 tonnes per year of Peel’s residential garbage to produce useable energy, such as steam or electricity and recover recyclable metals. It will allow the Region to reduce the overall volume of waste going to landfill by up to 90 per cent, decreasing its reliance on landfill disposal and its impact on the environment. “Over its lifetime, the new Centre will reduce greenhouse emissions to as little as half the greenhouse gases that are currently released by hauling our garbage to an out-of-Region landfill.” remarked Lee.

To ensure that the Centre’s workers, surrounding area residents and the environment as a whole are protected, the Peel Energy Recovery Centre will use advanced technologies to control and monitor emissions. The Region will also undertake a provincially regulated Environmental Screening Process to identify the potential environmental effects of this project and determine how best to address them, which will include conducting detailed studies on air quality, health, ground and surface water, traffic, noise, etc.

In 2012, the Region disposed of over 250,000 tonnes of residential garbage, which remained after residents reduced, reused, recycled and composted their household waste. Even with planned diversion programs, such as bi-weekly garbage collection, enhanced recycling programs and the implementation of Extended Producer Responsibility initiatives, current waste and household growth projections show that when the new Centre opens in 2020, the Region will need to dispose of more than 270,000 tonnes of garbage per year; with as much as 400,000 tonnes per year over the facility’s 30-40 year lifespan.

In 2010, Council directed the Region to conduct a Long-term Waste Disposal Study (completed in 2011) to identify the preferred long-term waste disposal method for Peel. Taking into account Peel’s specific social, environmental and economic considerations, the Study identified the use of an established energy-from-waste technology along with landfill disposal as the preferred option for Peel.
How would you rate the quality of this article?
1 2 3 4 5
Poor Excellent

Verification:
Enter the security code shown below:
img


Add comment
Comments